powder painting line / powder spraying line
1. computer casings powder coating line
Custom Design Powder Paint Coating Line For Hardware Products
Designquality of the coating equipment and technology design, the use ofcoating production line is essential. If the coating equipment is poorlydesigned process, even if the single piece of equipment, no matter howproduced, the entire coating production line is not good.
The coating equipment process design typical common errors are listed below:
Yield less than the design: somedesign does not consider painting equipment hanging not considerhanging Pitch, without considering on the downhill horizontal turninterferometer, production time does not consider the rejection rate,coating equipment utilization, peak production of the Programmecapability. Causing output to reach design briefs.
Coating equipment and technology is not enough:some design in order to reduce the cost by reducing the process time toachieve their goals. Common, such as: coating production linepre-treatment transition section to lack of time, resulting in thestring solution; curing does not consider the heating time, resulting inpoor curing; paint leveling time is not enough, causing the filmleveling is not enough; enough cured cooling, spray paint (or lowermember) workpiece overheating.
Transportation equipment poorly designed: theworkpiece is to be transported a variety of improper design, productioncapacity, process operation, the upper and lower parts will haveadverse consequences. Common suspension chain conveyor, its loadcapacity, towing capacity needs to be calculated and interferencedrawing. The speed of the chain supporting equipment must have thecorresponding requirements. Coating equipment for smooth chain,synchronization requirements.
Improper selection of painting equipment:also different due to the different product requirements, equipmentselection, and a variety of coating equipment has its advantages, thereare also disadvantages. The design can not explain to the user themanufacturing found very dissatisfied. Example, spray drying tunnel theair curtain insulation, cleanliness requirements of the workpiece is notinstalled purification equipment. This type of error is the most commonmistakes in the process design of the coating equipment.
Coating equipment, operating environment, painting, coatingprocesses and materials directly related to the production efficiency ofthe coating line. In this process, the process design of the coatingequipment the use of the coating line has an important influence, wecontinue to understand painting equipment process design typicalmistakes.
Coating equipment, process parameters inappropriate choice of:coating production line process parameters error of the more commonsingle coating equipment design parameters are chosen lower limit, thesecond is not paid enough attention to the equipment supporting, noDesign.
Supporting coating equipment missing items:more
coating line associated equipment, sometimes in order to reducethe quote, eliminating the need for some equipment. Also failed toexplain to the user, resulting in wrangling. Common pre-treatmentheating equipment, spraying equipment, air equipment, exhaust pipeequipment, environmental protection equipment.
Not consider painting equipment energy-saving:energy prices is changing rapidly, and the design failed to considerthese issues, allowing users to higher production costs, some users hadto use a relatively short period of time to reinvent and purchase ofequipment.
Ourcommitment to free technical guidance and tailored a new enterprise forown low-input high return process, we will make their own efforts tobuild a bridge to communicate with each other and common development forthe enterprise and between enterprises.